MIL-STD-810 Method 517 – Pyroshock Testing

  • Procedure I – Near-field with an actual configuration
  • Procedure II – Near-field with a simulated configuration
  • Procedure III – Mid-field with a mechanical test device
  • Procedure IV – Far-field with a mechanical test device
  • Procedure V – Far-field with an electrodynamic shaker